Groundwater Tubewells For Domestic and Industrial

2010 – Completed Projects

LIST OF COMPLETED PROJECTS (2010)
No Description Client
1 Pumping Test (72 hours Constant Discharge) Kejuruteraan KNK Sdn. Bhd
for at Kg. Soi, Kuantan, Pahang. – 2 wells. for Ministry of Agriculture
2 Supply and Install three (3) units of Kejuruteraan KNK Sdn. Bhd
Submersible pump at Kg. Soi, Kuantan, for Ministry of Agriculture
Pahang.
3 Long Term Pumping Test ( 30 days) at Sime Darby Water Resources
Kumpulan Darul Ehsan Bhd well field at (Selangor) Sdn. Bhd.
Banting, Selangor – 2 Tubewells
4 100 hours Pumping Test for Groundwater Sime Darby Water Resources
Development Studies in Sungai Panjang, (Selangor) Sdn. Bhd.
Selangor – 2 Tubewells
5 Construction of three (3) units 40mm Jabatan Mineral & Geosains,
diameter well point by water jetting method Johor.
in Pulau Sibu, Johor.
6 Pumping Test for Groundwater Development Sime Darby Water Resources
Studies at Batang Padang District, Perak. (Perak) Sdn. Bhd.
 – 36 Tubewells
7 Pumping Test (72 hours Constant Discharge) Terrain Resources Sdn. Bhd.
at Kg. Jenderam Hilir, Dengkil, Selangor for National Hydraulic Research
Institue of Malaysia (NAHRIM)
8 Drilling and Construction of 100mm diameter Terrain Resources Sdn. Bhd.
alluvium tubewells at Sg. Chongkak, Hulu for Jabatan Mineral & Geosains
Langat, Selangor – 30 wells. Selangor.
11 Construction of 40mm diameter Jetting Individuals and other SMI
Well points for SMI, domestic, agricultural
and others. – Jan – December 2010 – 21 wells
12 Pumping Test for Groundwater Development Sime Darby Water Resources
Studies at Batang Padang District, Perak. (Perak) Sdn. Bhd.
 – 7 Tubewells
13 Construction of 40mm diameter exploration Sime Darby Water Resources
tubewell by jetting method in Sungkai, (Perak) Sdn. Bhd.
Perak. – 14 units

Leave a comment

Tag Cloud